Colormetry CMU 324 HE and CLE
Commissioning in 10 steps
- STEP 01 | wall mounting
- STEP 02 | mounting filter casing assambly
- STEP 03 | wiring the device
- STEP 04 | connection Konverterbox [optional equipment]
- STEP 05 | remove transportation lock
- STEP 06 | insert reagent cartridge
- STEP 07 | supply water pressure
- STEP 08 | supply voltage [self check starts automatically]
- STEP 09 | if necessary deaerate system
- STEP 10 | program the device [setting operation parameters]
Service and Maintenance